£3,000 AWARDED
July 2021
Stained glass repairs to south nave window, high level guttering and stonework repairs, and tower flashing. Interior wall repairs
£2,000 AWARDED
July 2021
Analysis of wall painting evidence & internal decoration. Conservation of stonework, repair work to internal walls. In preparation for re-decorating and plaster repairs.
£5,000 AWARDED
July 2021
Extensive tower repairs. Re-pointing, replace tie rods & face plates, repairs to rainwater chutes, parapet repairs, overhaul weather vane, internal repairs to belfry and new louvres to silence chamber opening.
£3,000 Awarded
March 2021
New rainwater goods on both aisles, re-leading south aisle roof, repointing sections of east wall, re-plastering east and west walls of both aisles.
£3,000 Awarded
March 2021
Re-roof nave, and tower repairs. Coping over east window requires pointing and gutter repairs on north side of church Photo – courtesy of Simon Knott, @last_of_england
£3,000 Awarded
March 2021
Remove hard render from south and west elevations and replace with lime render. Remove cement based paint on brickwork, repoint as required and paint with Kiem shelter.
£7,000 Awarded
March 2021
Urgent repairs listed in 2020 Quinquennial Report. Porch & vestry roofs, and south chancel/nave buttresses. Photo – courtesy of Simon Knott, @last_of_england
£2,000 Awarded
November 2020
Inspection by structural engineer and contractor of rainwatergoods, drainage system and cracks in the tower. Photo – courtesy of Simon Knott, @last_of_england